Large scale building encapsulation, Canberra
Relevant experience includes large scale building encapsulation on a school development, intended to protect works from severe weather and reduce lost productivity on an exposed structure.
The enclosure was formed over perimeter scaffold across the full building footprint, sealed and tensioned so that trades inside could continue through conditions that would otherwise have stopped work on an open frame.
What the containment was intended to achieve
- Protection of exposed works
- Support for the continuation of construction activities
- Reduced rain related disruption
- Assistance with internal trade continuity